BHIMAN_HOME_New

The BHIMAN – BH20 is a long-range large-capacity heavy-weight autonomous Hybrid VTOL UAV for logistics and aerial cargo delivery. It operates 10x more economically than today’s helicopters, requires no runways, and brings enhanced safety and reliability.

ABOUT THE PROJECT

The Bhiman BH-20 has been developed by Edall Systems under the scheme of Technology Development Fund (TDF) from Defense Research and Development Organization (DRDO)

The TDF Scheme extends financial support and expertise to upgrade existing products/ systems, processes and its applications by reducing production costs, improving functionality and quality by promoting Make in India, and the development of futuristic technologies with defense applications.

LOW OPERATING COSTS

  • Battery-powered electric vertical propulsion. Low fuel consumption in cruise flight
  • Fully autonomous flight, remotely surveyed from the ground
  • 10 times lower operating cost than helicopters

VTOL CARGO CAPABILITY

  • Air cargo operations where a runway does not exist. Compatible with standard helicopter landing pads
  • Payloads of up to 20 kg in a 3x2x2 in size cargo compartment
  • Proven and certified lift with cruise propulsion system

SIMPLICITY OF OPERATION

  • Supports different types of cargo as per Military requirement
  • Unobstructed loading through the side door, even with a forklift
  • Simple dispatch and operation
Bhiman_Home_Concept1920x820

BHIMAN – BH20 : TECHNICAL DATA

DIMENSIONS

Total Length 3.6 m
Fuselage Length 2.7 m
Wingspan 4.6 m
Payload Dim. 0.9x0.6x0.6 m^3
Total Height 0.85 m

WEIGHT

MTOW 100 kg
Payload Weight 20 kg
Fuel Weight 3 kg
Airframe Weight 25 kg
Empty Weight 80 kg

PERFORMANCE

Endurance 1 hour
Range 10 km
Service Ceiling 20, 000 feet AMSL
Take-off Altitude 18, 000 feet AMSL
Max Payload 20 kg
Operating Temp. -20 to +40 deg C

GROUND CONTROL STATION

Picture4a1
  • Auto mission with out joy stick
  • Auto preflight check
  • On click point to point Auto-mission
  • In build pilot log details
Picture5a1

Image Gallery

slide 1
slide 1
slide 1
slide 1
Slide 01
MOU Signed for the Development of BHIMAN
Slide 02
TDF Team Visit to EDALL
Slide 03
TDF Meeting 15 June 2021
Slide 04
Brigadier Visit to EDALL
Slide 05
Display of BHMAN Scaled model at Army Training Centre
Slide 06
Display of BHIMAN Scaled Model in Army Training Centre
Slide 07
BHIMAN Rendered Image
Slide 08
BHIMAN at Aero India 2023
Slide 09
BHIMAN Scale 1 Model Under Development
Slide 10
BHIMAN Scale 1 Model
Slide 11
Bhiman Scale 1 Model
Slide 12
BHIMAN Scale 1 Model
previous arrowprevious arrow
next arrownext arrow
Shadow

Video Gallery

Bhiman Scale 1:2 First Flight Test
Bhiman Scale 1:3 First Flight Test
PlayPlay
Bhiman Scale 1:2 Second Flight Test
Bhiman Scale 1:3 Second Flight Test
PlayPlay
Bhiman Scale 1:2 Third Flight Test
Bhiman Scale 1:3 First Transition Test
PlayPlay
Bhiman Scale 1:2 Animation
Bhiman Scale Design and Assembly Animation Video
PlayPlay
Bhiman Scale 1:2 Flight Test
Bhiman Scale 1:2 First Flight Test
PlayPlay
Bhiman SITL Simulation and Timeline
Bhiman SITL Simulation and Project Timeline Video
PlayPlay
previous arrow
next arrow
Bhiman Scale 1:2 First Flight Test
Bhiman Scale 1:2 Second Flight Test
Bhiman Scale 1:2 Third Flight Test
Bhiman Scale 1:2 Animation
Bhiman Scale 1:2 Flight Test
Bhiman SITL Simulation and Timeline
previous arrow
next arrow
Scroll to Top